Two factors have been responsible for bringing about the changed requirements that have encouraged the construction, upgrading and replacement of transmission lines in recent years: the continued expansion of cross-border grid systems, and the structural changes taking place within transport and distribution infrastructures as a result of the increased utilisation of regenerative energy sources, especially wind energy. TSSECC actively updates its product and service portfolio to meet the latest market conditions. We aim to offer our customers the most reliable, powerful and cost-effective solutions, which always take into consideration the entire life cycle of the
• Tower Testing Station and R&D Centre for testing upto 800KV
D/C towers with Tower Base width – 27M x 27M (square and
rectangle), Height – 85mts and uplift capacity per leg of 500 MT
is one of the largest facility of its kind in the world.
• Over 12 nos. of Tension Stringing equipments upto 8/16 Tonnes
(capable of pulling quadruple conductors).
• Independent Quality Control system and Material Testing facilities.
• Specialized skills and software for design and project.